 |
This work represents one of our most challenging design projects
to date. Our clients, Frank and Kathy, not only wanted a world-class Home
Theater in the unfinished lower level of their newly completed Home, but
also a Game Area, Exercise Room, Bar, Full Kitchenette, Bathroom, Washer
and Dryer Area, Stone Fireplace and two guest rooms (Whew). The project
would entail over 2000 square feet of remodeling and present us with three
unique challenges.
One, our clients wanted the area to have two functional entrances, an
entrance from the pool area and another one on the opposite side from
the upper level, while maintaining an open feel to all the main areas.
Two, the HVAC plant is located eight feet from the back wall and was
in the area to be finished. And, last but not least, the basement had
dozens of beam posts we needed to incorporate in the design! Hence our
name for this project- Post-Time. |